Release years
2022Grand Opening of Peljesac Bridge (C) - First Day Cover
2022 Grand Opening of Peljesac Bridge (C) - First Day Cover for only GBP £0.88
- 26.07.2022
- Author: Dean Roksandić, designer from Zagreb, Photo by: Mario Babarović, photographer from Dubrovnik
- AKD d.o.o., Zagreb
- Offset Printing
- Multicolor
- 29.82 x 48.28 mm
- Value: letter code A
The Pelješac Bridge is a part of the national road which goes around the Neum Corridor. It is a part of the project called "Road Connection with Southern Dalmatia". The project includes the construction of the bridge, access roads to the bridge as well as the Ston bypass, which has enabled the establishment of a strong road connection between the separated parts of the land territory of the Republic of Croatia. The 32.5 kilometers long two-lane state road connects the far south and is an essential prerequisite for the development of the mainland and islands of the Dubrovnik area. The 2404 meters long Pelješac Bridge is the most challenging part of the project and it crosses a sea strait – the Mali Ston Channel. The project "Road Connection with Southern Dalmatia" is a strategic interest of the Republic of Croatia. It is also located on one of the European transport corridors, therefore it has been largely financed from the EU funds.
Croatia - Recommended stamp issues
WOPA+ recommended stamp issues
100th Anniversary of RIESS Enamelware |
Issued: 28.01.2022 |
›Austria |
Portuguese Merchant Navy Ships |
Issued: 29.05.2024 |
›Portugal |
Year Set 2021 |
Issued: 31.12.2021 |
›Croatia |
Dogs |
Issued: 06.06.2024 |
›Great Britain |
Paris 2024 |
Issued: 26.07.2024 |
›Romania |
Lohner-Porsche Mixte |
Issued: 21.01.2022 |
›Austria |
UEFA EURO 2024 |
Issued: 23.07.2024 |
›Azerbaijan |
Aviation Anniversaries |
Issued: 28.05.2024 |
›Isle of Man |
Arrival Of The Mail Coach |
Issued: 19.01.2022 |
›Austria |
Personalities |
Issued: 05.01.2022 |
›Romania |
Red Arrows 60th Anniversary |
Issued: 25.06.2024 |
›Gibraltar |
Franking Labels |
Issued: 03.01.2022 |
›Faroe Islands |